The project includes the total demolition of Terminal 2 as well as the demolition of substantial aircraft parking apron. Architect: Parsons 3DI. Size: , SF. Location: San Antonio, Texas. The estimating staff is both creative and innovative in assisting an Owner in achieving the stated budget. They are positive, competent, hard-working, and solution focused. You have been quick to respond to any need that we had as we settled into our new building.
Every deadline was met, every estimate was accurate and every commitment was honored. We look forward to the opportunity to work with Byrne Construction Services again in the future. We feel fortunate to have had the Byrne team as a part of this successful effort, and would like to compliment your staff. Not only did they finish on time, but they were excellent to work with.
Great experience and different than any other construction project I have been a part of. All the work at this facility was done in a safe manner and with the highest quality craftsmanship. I would highly recommend the Byrne construction team to any hospital looking for a quality contractor. It is without hesitation that we welcome ongoing opportunities to continue working with Byrne, and we have no reservations in recommending Byrne to others in similar pursuits.
DMA Trustees and staff alike appreciated the partnership that was forged during construction. Tuesday is another busy day at San Antonio International Airport. Jim and Mona are flying back home to New Jersey and said they would only change one thing about our local airport. The airport had an open house Tuesday night. Airport officials walked us through their newest expansion projects, which should be completed by Expansion will be added onto existing Terminals A and B.
Three new gates will be in place by and construction on Terminal C will start in There is the potential for infrastructure funds to be applied to the program. In addition to the terminal construction work the two-level road in front of terminal one will be expanded for the extra capacity of the new terminal B and terminal C.
A joint venture of Bartlett Cocke Contractors, Walbridge and HNTB Corporation was the contractor responsible for the design and construction of the parking garage completed in January The first phase included demolition of existing aircraft ramp pavements and utilities between existing terminals one and two, and the reconstruction of ramp and utilities to accommodate terminal B. The project involved reconfiguring ticketing and baggage claim lobbies and relocation of TSA screening equipment and airline tenants within the terminal.
The relocations also allowed selective demolition of the east portion of terminal two for construction of terminal B. SpawGlass Contractors, in collaboration with Reynolds, Smith, and Hills, was responsible for the renovation work of the Terminal A building. San Antonio International Airport currently has three runways. Rented cars, taxis, bus shuttles, hotel shuttles, city buses, charter buses and limousines are available at terminal A and B baggage claim area.
Project Start Project Type Terminal expansion, runway extension, road refurbishment. Passengers Approximately 8. San Antonio Airport is a minor hub or hublet for United Airlines. Terminal one lobby at San Antonio Airport.