Worcester boiler 25si manual




















Refer to the latest IEE wiring regulations. See Contact Information inside front cover. Remove template F and wall mounting frame E from the packaging. Remove boiler bottom panel D , front fascia H and installer pack C.

Remove any packaging within the boiler and the packaging base C. Connect the pressure relief drain pipe to 15mm compression joint J using the compression nut and olive supplied in the hardware literature pack. After cutting, the end must be square and free from burrs to prevent damage to the mm flue seals. Re-fit the drainage cap to bottom of the syphon. These are not polarity sensitive. The boiler will be reset.

Operate the appliance and take note of any irregularities. Refer to Fault Finding for rectification procedures. Lowering boiler control to the service position 2. Re-fit the drainage cap E to bottom of the syphon. It must fall at least 50mm per metre towards the outlet.

Removing outer case 1. Fan The isolator must have a contact separation of 3mm minimum in all poles. External fuse rating 3A. View the manual for the Worcester Greenstar 25Si Compact here, for free. This manual is available in the following languages: English.

Below, you will find the most frequently asked questions about the Worcester Greenstar 25Si Compact. Is your question not listed? Thomas Dempsey, 2 comments 0. Green Star 25I Installed 3 months ago. Thomas, Andrea Rothery, Answer this question Send. About the Worcester Greenstar 25i.



0コメント

  • 1000 / 1000